Solutions / Industrial safety
PLANT OPERATIONS · CONFINED SPACE WORK
Pull someone out before heat strain becomes an incident
The stand-down and the physiological evidence for it are recorded together, which is exactly what an inspector will ask for six months later.
WHENCore temperature proxy and heart-rate reserve both pass the fatigue threshold learned for that wearer.
ASKThe shift supervisor approves within 60 seconds, with the reason on the card.
THENIssue a stand-down, log it against the work permit, and start a rest timer.
2.4×more stand-downs issued before symptoms appear
60 ssupervisor window, cancel on expiry
OPC-UAnative dispatch into plant systems
Pilot figures, indicative rather than contractual.
Start with one ward, one shift, or one squad
A pilot runs four to sixteen weeks depending on deployment model. You bring the population and the responders. We bring devices, gateways and the first set of rules, and we measure override rate and time-to-answer from day one.